bifa·必发

Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd. plans to invest in the construction of a centralized wastewater treatment plant project (hereinafter referred to as “the Project”). Yu 2025 Year 12 Moon 21 Daily entrustment Guangdong Ruixing Environmental Technology Co., Ltd. Carry out environmental impact assessment work in accordance with the “Measures for Public Participation in Environmental Impact Assessment” (Ministry of Ecology and Environment No. [number]...). 4 In accordance with the relevant provisions of the “Order,” we are now issuing the first public notice for public participation in the environmental impact assessment.

I. Project Overview

Project Name: Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd. Centralized Wastewater Treatment Plant Construction Project

Construction Unit: Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd.

Construction location: Yuyuan Fourth Road, Yuyuan Industrial Zone, Huangjiang Town, Dongguan City 7 Number (center latitude and longitude: East longitude: 114°0′25.105″ , North Latitude: 22°53′24.904″ 。。

Project Overview: Total investment of this project 12000 Ten thousand yuan, total land area 30601 m 2, Construction 1 A centralized wastewater treatment plant, primarily responsible for treating... Production wastewater from the subsidiaries of the group to which Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd. belongs. 。。

II. Name and Contact Information of the Construction Entity

Construction Unit: Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd.

Contact: Engineer Huang         Phone: 18046920929   

III. Name and contact information of the entity preparing the Environmental Impact Report

Assessing Entity: Guangdong Ruixing Environmental Technology Co., Ltd. ;

Address: West Houjie Avenue, Houjie Town, Dongguan City, Guangdong Province 115 Number

Contact: Engineer Yang      Phone: 15916925204; Email: 2508584646@qq.com

IV. Online Link to the Public Opinion Form

http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

V. Methods and channels for public comments, as well as the start and end dates.

If the public has any comments, they can provide feedback to the construction entity via telephone or email.

Start and end time: 2025 Year 12 Moon 22 Date to 2026 Year 1 Moon 5 Day, total 10 Working days.

Dongguan Lingjie Metal Precision Manufacturing Technology Co., Ltd.

2025 Year 12 Moon 22 day

【网站地图】